Femrite Drive Penito Creek CONSPAN Bridge

  • Location: Madison, Wisconsin
  • Contractor: Contech Engineered Solutions
  • Size: 75 LF of 24′ span x 6′ rise bridge
  • Purpose: To provide a bridge over Penito Creek for Femrite Drive.

Twitter
Visit Us
Follow Me
LinkedIn
Share
Follow by Email
RSS

About this Project

Wieser Concrete produced 75 LF of 24′ span x 6′ rise bridge for Femrite Drive over Penito Creek. The bridge headwalls and wingwalls have a formliner finish.

«
»