Purpose:To provide a bridge for a waterway that runs through the Indiana Dunes Creek.
About this Project
Wieser Concrete produced 136 LF of 12′ span x 8′ rise bridge for the Dunes Creek Restoration project in Porter County, Indiana. The project includes 53 colored headwalls with reveals. This was phase two of the Dunes Creek Restoration.