Wastewater Treatment Facility Laporte, Minnesota

PROJECT SCOPE

  • 2 – 18,000 Gallon Recirculation Tanks
  • 2 – 6010 Gallon Septic Tanks
  • 1 – 1,000 Gallon Settling Tank
  • 1 – 6000 Gallon Grease Interceptor
  • 48 – 1,000 Gallon Septic Tanks

PRODUCT PRODUCTION REQUIREMENTS

  • Tanks and Accessories were produced to engineering epecifications.

INSTALLATION TIMELINE

  • Tanks were delivered and set as needed by contractor.

OTHER

  • Engineer: Thatcher Engineering, Minneapolis, MN