Dietsche Dairy – Loyal, Wisconsin
PROJECT SCOPE
- Install Bunker Silo
PRODUCT PRODUCTION REQUIREMENTS
- 816′ – 12′ T-Panel
- 385′ – 16′ L-Panel
- 231′ – 16′ T-Panel
INSTALLATION TIMELINE
- Initial order was for twin-cell bunker silo constructed of 336′ of 12′ t-panel.
- Bunker was expanded each year as storage needs increased.
OTHER
- Initial panels were installed 10 days after customer placed order.
- Carefully controlled inventory makes product available for shorter, on-time delivery schedule without increasing product cost.