– Mound, Minnesota
PROJECT SCOPE
- 2 – 16,750 Gallon Tank
- 2 – 10,000 Gallon Septic Tank
PRODUCT PRODUCTION REQUIREMENTS
- Tanks and accessories were produced to engineering specifications.
INSTALLATION TIMELINE
- Tanks were delivered and set as needed by contractor.
OTHER
- Engineer: · North American Wetland Engineering Forest Lake, Minnesota
- Contractor: · J R Ferche Rice, Minnesota