Organic Valley Distribution Center Building

  • Location: Cashton, Wisconsin
  • Contractor: Wieser Brothers General Contractor
  • Size: 7,000 sq. ft. of 26′ tall x 12″ thick panels with 4″ insulation
  • Purpose: To provide a new distribution center building for Organic Valley Family of Farms.

Twitter
Visit Us
Follow Me
LinkedIn
Share
Follow by Email
RSS

About this Project

Wieser Concrete produced 7,000 square feet of 26′ tall x 12″ thick building panels with 4″ insulation for the Organic Valley Farms Distribution Center.

This design/build distribution center includes a 35,000 square foot refrigerated warehouse with walls 85’ tall for an Automated Storage and Retrieval System to store up to 12,000 pallet positions. The project also includes a 35,000 square foot traditional refrigerated warehouse with a produce room, a meat storage room, and a blast freezer. Attached to the warehouse is a 14,000 square foot office area that is able to house up to 70 employees. This project was completed within twelve months to meet the schedule of Organic Valley’s needs. See Wieser Brothers here.

«
»