Austin Straubel Airport Expansion Utility VaultsGreen Bay, Wisconsin

PROJECT SCOPE

  • 16,750 Grease Interceptor
  • 12′ X 18′ Utility Vault
  • 11′ X 12′ Threeway Manholes
  • 6′ X 12′ Manholes
  • 48″ Diameter Handholes

PRODUCT PRODUCTION REQUIREMENTS

  • Product production was ongoing as required to meet contractor’s requirements.

INSTALLATION TIMELINE

  • On-Going – Structures are delivered and installed to meet contractor’s needs.

OTHER

Wieser Concrete Advantages:

  • Reliable, professional delivery personnel, able to assist with installation.
  • Dependable product quality has meant fewer construction problems for contractor.