Austin Straubel Airport Expansion Utility Vaults – Green Bay, Wisconsin
PROJECT SCOPE
- 16,750 Grease Interceptor
- 12′ X 18′ Utility Vault
- 11′ X 12′ Threeway Manholes
- 6′ X 12′ Manholes
- 48″ Diameter Handholes
PRODUCT PRODUCTION REQUIREMENTS
- Product production was ongoing as required to meet contractor’s requirements.
INSTALLATION TIMELINE
- On-Going – Structures are delivered and installed to meet contractor’s needs.
OTHER
Wieser Concrete Advantages:
- Reliable, professional delivery personnel, able to assist with installation.
- Dependable product quality has meant fewer construction problems for contractor.