Bowes Road CONSPAN
Bridge

  • Location: Elgin, Illinois
  • Contractor: Contech Engineered Solutions
  • Size: 32′ span x 7′ rise
  • Purpose: To provide a bridge for Bowes Road over a waterway.

About this Project

Wieser Concrete produced a CONSPAN bridge for Bowes Road in Elgin, Illinois. The bridge has a 32′ span and 7′ rise at 50 LF total. Included in the project were four wingwalls, two headwalls with guardrail inserts, and a formliner finish.

Bowes Road CONSPAN Bridge by Wieser Concrete
Bowes Road CONSPAN Bridge by Wieser Concrete
Bowes Road CONSPAN Bridge by Wieser Concrete
Bowes Road CONSPAN Bridge by Wieser Concrete
Bowes Road CONSPAN Bridge by Wieser Concrete
«
»