Minneapolis-St. Paul International Airport Runway Improvements Bloomington, Minnesota

PROJECT SCOPE

  • 11′ x 12′ Threeway Manholes
  • 6′ x 12′ Manholes
  • 48″ Diameter Handholes

PRODUCT PRODUCTION REQUIREMENTS

  • Product production was ongoing as required to meet contractor’s requirements.

INSTALLATION TIMELINE

  • On-going – structures are delivered and installed to meet contractor’s needs setting bottom section in place.

OTHER

  • Reliable, professional delivery personnel, able to assist with installation.
  • Dependable product quality has meant fewer construction problems for contractor.