Smuckers, USARipon, Wisconsin

PROJECT SCOPE

  • Is part of a water softener system designed to provide soft water for removal of water spots from jelly jars.

PRODUCT PRODUCTION REQUIREMENTS

  • Precast Product: 12,000 Gallon Holding Tank

INSTALLATION TIMELINE

  • As required by customer.

OTHER

  • Engineer/Designer – Jim Godson Smuckers USA Ripon, Wisconsin
  • Contractor: Pollesch/Kinah Green Lake, Wisconsin