Smuckers, USA – Ripon, Wisconsin
PROJECT SCOPE
- Is part of a water softener system designed to provide soft water for removal of water spots from jelly jars.
PRODUCT PRODUCTION REQUIREMENTS
- Precast Product: 12,000 Gallon Holding Tank
INSTALLATION TIMELINE
- As required by customer.
OTHER
- Engineer/Designer – Jim Godson Smuckers USA Ripon, Wisconsin
- Contractor: Pollesch/Kinah Green Lake, Wisconsin