Pagel’s Ponderosa – Kewaunee, Wisconsin
PROJECT SCOPE
- Install Bunker Silo
PRODUCT PRODUCTION REQUIREMENTS
- 984′ – 12′ T-Panel
- 192′ – 12′ L-Panel
INSTALLATION TIMELINE
- Initial order was for bunker silo constructed of 160′ of 12′ T-Panel.
- Bunker was expanded annually as storage needs increased.
OTHER
- Ability to easily reconfigure and increase storage capacity was important factor in selecting Wieser precast bunker silo panels.