Underground

Fauquier County Onsite Wastewater Treatment System
Location: Fauquier County, Virginia Contractor: English Construction Engineer: Bowman Consulting Engineering Size: 18 precast tanks ranging from 3,000-gallon capacity up to 40,000-gallon capacity. Purpose: To provide wastewater treatment for the towns

Kwik Trip Water Detention Box Culvert
Location: Beaver Dam, Wisconsin Contractor: W&D Navis, Inc. Size: 104 LF of 6′ by 6′ box culvert Purpose: To provide underground water detention for a new Kwik Trip. About

Amazon Prime CVG Air Hub Box Culvert
Location: Cincinnati/Northern Kentucky International Airport Contractors: AECOM Hunt Construction and Kokosing Construction Engineers: Wieser Concrete, Delta Engineers, and Gresham Smith Size: Approximately 13,000′ of box culverts total Purpose: To provide stormwater