Project Location: Lake Hallie, Wisconsin
Customer: Venture Academy
Products: Precast Concrete Septic Tanks, Flow Tank, Pretreatment Tank, Clarification Tank, Dose Tank, Lift Station & Flow Meter Manhole
Purpose: To provide a complete and reliable onsite wastewater treatment solution that improves treatment efficiency and effluent quality while offering durable construction, efficient installation, low maintenance, and long-term performance.
About this Project

Venture Academy Wastewater System– Lake Hallie by Wieser Concrete
Wieser Concrete manufactured and delivered a complete precast concrete wastewater treatment system for Venture Academy in Lake Hallie, Wisconsin. The system was designed to provide a reliable, long-lasting onsite solution for the facility.
The project included five precast concrete tanks, a lift station, and a flow meter manhole. The system included a W20000 Septic Tank, W20000 Flow Tank, W3000/3000 Pretreatment Tank, W3000/1800 Clarification Tank, and WEHD3000 Dose Tank.

Venture Academy Wastewater System– Lake Hallie by Wieser Concrete
Each tank has an important role in the wastewater treatment process. The system handles wastewater collection, flow control, pretreatment, clarification, and controlled dosing. Together, these components create a complete system designed for reliable and efficient operation.
All precast concrete wastewater tanks were manufactured by Wieser Concrete to provide strength, durability, and a long service life. Using precast concrete also allows the tanks to arrive at the job site ready for installation, helping reduce work on-site.
This project shows how Wieser Concrete can provide a complete precast wastewater treatment system. From septic and flow tanks to pretreatment, clarification, and dose tanks, Wieser provides the precast products needed for the entire system.


Venture Academy Wastewater System– Lake Hallie by Wieser Concrete