Penn-American Twin-Cell Box Culvert

Location: Bloomington, Minnesota

Contractor: Minger Construction

Size: 16 ft x 9 ft twin cell box culvert

Purpose: To provide stormwater storage for the Penn-American area development.

About this Project

Phase 3 of the Penn-American area development in Bloomington, Minnesota is underway, which is near our Maiden Rock plant. We are producing 170 pieces of the 16 ft x 9 ft box culvert that are currently being installed for the linear stormwater storage project. With the heaviest section weighing about 56,000 lbs, the large twin cell culvert pieces are being manufactured in 4 ft lengths to provide efficient shipping and installation.

The headwalls on each end of the 700 linear foot box culvert weigh 78,950 lbs each. A three-foot drop was incorporated in the design for one end of the culvert, spanning 40 feet under a roadway. The first phase of development for the Penn-American District began in September 2012 and redevelopment is expected to continue over the next couple of decades, according to the City of Bloomington. Projects for the area include rental units, retail space, restaurants, hotels, parking structures, and a designated Transit Improvement Area for future commuter transportation.

Related Projects

I-94 Hudson Wis DOT Super Slabs

Location: Hudson, Wisconsin Contractor: Ayres Associates Size: 210 precast super slab panels Purpose: To repair approximately 500 concrete joints along Interstate 94. About this Project

Read More

Calumet County Contech Bridge

Location: County Trunk Highway PP in Calumet County, Wisconsin Contractor: Calumet County Highway Department Engineer: Contech Engineered Solutions Size: 36′ span x 8′ rise

Read More