Venture Academy Wastewater System

Project Location: Lake Hallie, WisconsinCustomer: Venture AcademyProducts: Precast Concrete Septic Tanks, Flow Tank, Pretreatment Tank, Clarification Tank, Dose Tank, Lift Station & Flow Meter Manhole Purpose: To provide a complete and reliable onsite wastewater treatment solution that improves treatment efficiency and effluent quality while offering durable construction, efficient installation, low maintenance, and long-term performance. About […]

Fauquier County Onsite Wastewater Treatment System

Location: Fauquier County, Virginia Contractor: English Construction Engineer: Bowman Consulting Engineering Size: 18 precast tanks ranging from 3,000-gallon capacity up to 40,000-gallon capacity. Purpose: To provide wastewater treatment for the towns of Catlett and Calverton, Virginia. About this Project Less than 50 miles from the White House, the two small towns of Catlett and Calverton, VA were in need of an […]

Kwik Trip Water Detention Box Culvert

Location: Beaver Dam, Wisconsin Contractor: W&D Navis, Inc. Size: 104 LF of 6′ by 6′ box culvert Purpose: To provide underground water detention for a new Kwik Trip. About this Project Expanding on its presence in Beaver Dam, Kwik Trip is building an updated facility across the street from a dated Kwik Trip building. The city annexed three properties […]

Amazon Prime CVG Air Hub Box Culvert

Location: Cincinnati/Northern Kentucky International Airport Contractors: AECOM Hunt Construction and Kokosing Construction Engineers: Wieser Concrete, Delta Engineers, and Gresham Smith Size: Approximately 13,000′ of box culverts total Purpose: To provide stormwater drainage for the runoff at the new facility. About this Project In spring 2019, Amazon began phase one of its $1.5 billion project at Cincinnati/Northern Kentucky International Airport (CVG). The […]