Campground Septic System Project

Share

Underground Profiles

Campground Septic System Project

PLYMOUTH ROCK CAMPGROUND SEPTIC SYSTEM INSTALLATION SHEBOYGAN COUNTY, WISCONSIN

PROJECT SCOPE:

  • INSTALL A SEPTIC SYSTEM FOR THE PLYMOUTH ROCK CAMPGROUND

PRODUCT PRODUCTION REQUIREMENTS:

  • 1 – 4200 GALLON DOSE TANK
  • 1 – 9100 GALLON SEPTIC TANK

INSTALLATION TIMELINE:

  • 3 HOURS

OTHER:

  • INSTALLATION REQUIRED POWER TO BE SHUT-OFF FOR 60 HOMES AND THE CAMPGROUND BECAUSE THE TANKS HAD TO BE LIFTED OVER THE POWER LINES TO BE SET. THE TOTAL CRANE REACH TO SET DOSE TANK WAS 73 FEET. POWER WAS RESTORED WITHIN 3 HOURS OF POWER SHUTDOWN.