Airport Utility Vault Project

Share

Airport Utility Vault Project

AUSTIN STRAUBEL AIRPORT EXPANSION UTILITY VAULTS GREEN BAY, WISCONSIN

PROJECT SCOPE:

  • 1- 10′ x 10′ RECTANGULAR BOX
  • 1- 10′ x 10′ x 6″ TRIANGULAR BOX
  • 1- 48″ HAND HOLD

PRODUCT PRODUCTION REQUIREMENTS:

  • 1-10′ x 10′ RECTANGULAR BOX
  • 1 – 10′ x 10′ x 6″ TRIANGULAR BOX
  • 1- 48″ HAND HOLD

INSTALLATION TIMELINE:

  • AS PROJECT REQUIRED

OTHER:

  • CONTRACTOR: C.D. SMITH – FOND DU LAC, WISCONSIN
  • DESIGNER: MEAD & HUNT, INC. – GREEN BAY, WISCONSIN