Noise Wall Project

Share

 

 

Noise Wall Project

INTERSTATE 394 NOISE WALL CONSTRUCTION
MINNEAPOLIS/ST. PAUL, MINNESOTA

PROJECT SCOPE:
  • ARCHITECTURAL PRECAST NOISE WALL
PRODUCT PRODUCTION REQUIREMENTS:
  • PRESTRESS H-COLUMNS
  • 6” THICK PRECAST WALLS WITH BRICK FORM LINER ON BOTH SIDES
INSTALLATION TIMELINE:
  • INSTALLED BY CONTRACTOR 14 DAYS AHEAD OF SCHEDULE INTERSTATE NOISE WALL
OTHER:
  • WIESER DESIGNED AND BUILT THE H-COLUMN FORMS AND BATTERY WALL FORMS TO POUR THE PANELS VERTICAL AND ENSURE CONSISTENT PRODUCT QUALITY.